Update 8 - November

11.9.26

  1. Wood framing at exterior walls is ongoing.

  2. Wood framing of interior walls is ongoing

  3. Wood floor framing is ongoing.

  4. Wood framing at sanctuary high roof is ongoing. 

  5. Concrete at Interior Stair '1' has been installed.

  6. Cold formed metal framing at exterior sanctuary perimeter is ongoing.

  7. MEP in-wall & overhead rough-ins is ongoing.